Concrete formwork nearly complete!

  • Writer: SORA design
    SORA design
  • Jun 5, 2021
  • 1 min read

Updated: Aug 17, 2021

Concrete for the upper level footings will be poured this coming week. We now see the perimeter of the house being set. We are starting to see details such as the front porch location, vent locations, garage door openings, and connection points between the footings and retaining wall.