Concrete formwork nearly complete!
- SORA design
- Jun 5, 2021
- 1 min read
Updated: Aug 17, 2021
Concrete for the upper level footings will be poured this coming week. We now see the perimeter of the house being set. We are starting to see details such as the front porch location, vent locations, garage door openings, and connection points between the footings and retaining wall.