top of page

Roof framing and Glulam beam installation

  • Writer: SORA design
    SORA design
  • Aug 13, 2021
  • 1 min read

Updated: Aug 17, 2021

The roof framing and sheathing is progressing, and the first of the glulam beams are being set in. We couldn't help ourselves; Here are some overlays of the construction with the renderings of those spaces. Exciting progress, James Frank Construction!


 
 
 

Kommentare


bottom of page